User Password

News
divider

Latest News:

August 2008

FloTech Ltd installed the world’s first slim-hole FloMatik ICD completion in a Middle Eastern oil well.

read moreRead more

July 2008

PLT surveys from second FloMatik Installation show 2 fold increase in oil production

read moreRead more

June 2008

PLT surveys from first FloMatik Installation show 2 fold increase in oil production

read moreRead more

April 2008.

FloTech participated in the first industrial Technology Forum on Passive Inflow Control Devices, PICT, held in Bahrain.

read moreRead more

March 2008.

FloTech Ltd installed their second FloMatik completion in the Middle Eastern oil well.

read moreRead more

December 2007.

FloTech Ltd installed the first FloMatik completion Inflow Control Device (ICD) in the Middle East, in a work over well.

read moreRead more

October 2008.

FloTech Ltd installed the first FloMatik™ completion with FloSeal™ Open Hole packer in a Middle Eastern oil well.

FloTech Ltd installed a FloMatik ICD completion for a major Middle East operator using the new generation Mechanical Openhole packer ‘FloSeal’. The packer setting procedures went as per plan, and the losses after the installation were reduced by 75%.


FloTech Ltd is now officially an qualified ICD provider for the biggest oil producer in the Middle East

After the successful installation of the FloMatik system, and the successful evaluation through Production logging and better than expected productivity results, Flotech Ltd is now officially qualified as an ICD provider for the biggest oil producer in the middle east.