User Password
PLT surveys from first FloMatik Installation show 2 fold increase in oil production
FloTech participated in the first industrial Technology Forum on Passive Inflow Control Devices, PICT, held in Bahrain.
FloTech Ltd installed their second FloMatik completion in the Middle Eastern oil well.
FloTech Ltd installed the first FloMatik completion Inflow Control Device (ICD) in the Middle East, in a work over well.
PLT surveys were performed in the second FloMatik installation well in the Middle East. The PLT survey confirmed that the oil rate had increased by 200% and water cut reduced from 50% to 8% significantly improving well performance.