User Password

News
divider

Latest News:

October 2008

FloTech Ltd installed the first FloMatik™ completion with FloSeal™ Open Hole packer in a Middle Eastern oil well.

read moreRead more

FloTech Ltd is now an officially qualified ICD provider for the biggest oil producer in the Middle East

read moreRead more

August 2008

FloTech Ltd installed the world’s first slim-hole FloMatik ICD completion in a Middle Eastern oil well.

read moreRead more

July 2008

PLT surveys from second FloMatik Installation show 2 fold increase in oil production

read moreRead more

June 2008

PLT surveys from first FloMatik Installation show 2 fold increase in oil production

read moreRead more

April 2008.

FloTech participated in the first industrial Technology Forum on Passive Inflow Control Devices, PICT, held in Bahrain.

read moreRead more

March 2008.

FloTech Ltd installed their second FloMatik completion in the Middle Eastern oil well.

read moreRead more

December 2007.

FloTech Ltd installed the first FloMatik completion Inflow Control Device (ICD) in the Middle East, in a work over well.

read moreRead more

January 2009

Following the installation of the world’s first slim-hole FloMatik ICD completion the PLT shows extremely promising flow performance.

After the installation by FloTech of the world’s first slim-hole FloMatik ICD completion for a major middle east operator, a PLT survey was ran in order to assess production performance. The results shows extremely favourable production results. Another two wells using the same technology are planned in the following weeks.