User Password

News
divider

Latest News:

July 2008

PLT surveys from second FloMatik Installation show 2 fold increase in oil production

read moreRead more

June 2008

PLT surveys from first FloMatik Installation show 2 fold increase in oil production

read moreRead more

April 2008.

FloTech participated in the first industrial Technology Forum on Passive Inflow Control Devices, PICT, held in Bahrain.

read moreRead more

March 2008.

FloTech Ltd installed their second FloMatik completion in the Middle Eastern oil well.

read moreRead more

December 2007.

FloTech Ltd installed the first FloMatik completion Inflow Control Device (ICD) in the Middle East, in a work over well.

read moreRead more

August 2008.

FloTech Ltd installed the world’s first slim-hole FloMatik ICD completion in a Middle Eastern oil well.
World’s first slim-hole ICD completion

FloTech Ltd installed the world’s first slim-hole FloMatik ICD completion for a major middle east operator.

This was the world’s first tri-lateral slim-hole (3 7/8” open hole) FloMatik and open-hole swellable packer installation where the 2 7/8” FloMatik ICD’s will passively control the inflow from all three laterals.

The installation was flawless getting to TD