User Password
PLT surveys from second FloMatik Installation show 2 fold increase in oil production
PLT surveys from first FloMatik Installation show 2 fold increase in oil production
FloTech participated in the first industrial Technology Forum on Passive Inflow Control Devices, PICT, held in Bahrain.
FloTech Ltd installed their second FloMatik completion in the Middle Eastern oil well.
FloTech Ltd installed the first FloMatik completion Inflow Control Device (ICD) in the Middle East, in a work over well.
FloTech Ltd installed the world’s first slim-hole FloMatik ICD completion for a major middle east operator.
This was the world’s first tri-lateral slim-hole (3 7/8” open hole) FloMatik and open-hole swellable packer installation where the 2 7/8” FloMatik ICD’s will passively control the inflow from all three laterals.
The installation was flawless getting to TD